 |
SHOPPING GUIDE
Measure Your Area To
determine the length of misting line you'll need, measure the outer
perimeter of the area you intend to cool. Then measure the distance from
the pump to the misting line. Be sure to include changes in elevations.
Determine Nozzle Type We
offer nozzles for different types of areas. Determine if you are in a
dry or humid area and select nozzles accordingly for optimal performance
and longevity.
View our installation video below for more helpful hints & tips on installing your misting system.
| Pump | 20' | 30'
| 40'
| 50'
| 60'
| 70' | 80'
| 90'
| 100'
| Humid
| G2-20, M20 | G2-20, M20 | G2-20, M20 | G2-20, M20
| G2-20, M20
| G2-20, M20
| G2-40, M44
| G2-40, M44
| G2-40, M44
| | Dry | G2-20, M20 | G2-20, M20 | G2-20, M20
| G2-20, M20
| G2-40, M44
| G2-40, M44
| G2-40, M44
| G2-40, M44
| G2-40, M44
| Nylon Tubing
| 20
| 20
| 20 | 20 | 20 | 20
| 20
| 20 | 20 | Nozzles (Humid or Dry)
| 10
| 15
| 20
| 25
| 30
| 35
| 40
| 45
| 50
| 3/8" Stainless Steel Misting Line, 24" OC
| 20
| 30
| 40
| 50
| 60
| 70
| 80
| 90
| 100
| | 3/8" Compression Endcap, SS | 1
| 1
| 1
| 1
| 1
| 1
| 1
| 1
| 1
| 3/8" Compression Union, SS
| 2
| 3
| 4
| 6
| 7
| 8
| 9
| 11
| 12
| 3/8" Compression Elbow, SS
| 2
| 2
| 2
| 2
| 2
| 2
| 2
| 2
| 2
| 3/8" Compression x 1/4" Male Connector, SS
| 1
| 1
| 1
| 1
| 1
| 1
| 1
| 1
| 1
| Nickel Plated Push In Female Connector
| 2
| 2
| 2
| 2
| 2
| 2
| 2
| 2
| 2
| SS Cushioned Loop Clamps
| 20
| 25
| 30
| 35
| 40
| 45
| 50
| 55
| 60
| Tube Cutter
| 1 | 1
| 1
| 1
| 1
| 1
| 1
| 1
| 1
|
|
|
 |